EPS Partners with ELEK Software for Enhanced HV Cable Design
EPS is excited to announce our partnership with ELEK Software, integrating their ELEK Cable HV software into our electrical engineering toolkit. This addition expands our capacity to provide dependable, efficient, and future-ready designs that meet the unique needs of our clients in industries such as:
HV Substations and Power Grid
Renewables (Onshore & Offshore Wind, Solar PV)
Battery Energy Storage Systems (BESS)
Marine & Offshore Facilities
Manufacturing & Process
Pharmaceuticals & Petrochemicals
Data Centres
Distribution Networks
Why ELEK Cable HV?
The addition of ELEK Cable HV to our software suite enhances our capabilities for:
Thermal Performance Evaluation: The software assesses heating and temperature profiles to verify compliance with thermal limits and prevent overheating.
Accurate Cable Rating Analysis: ELEK calculates the current-carrying capacity of HV cables, ensuring reliable operation under various load conditions.
Precision Cable Sizing: Ensures cables are optimally sized to reduce energy loss and meet project-specific demands.
Voltage Drop Analysis: Delivers accurate assessments maintaining system power quality and reliability.
Cable’s sheath over-voltage calculations: Capable of accurately calculating over-voltages in cable sheaths, which is crucial for ensuring the integrity of cable insulation, particularly during unbalanced fault conditions.
Short-Circuit Analysis: Models short-circuit behaviour, helping to confirm the cable’s ability to withstand fault currents safely.
Complex Cable Configuration Modelling: Creates detailed models for intricate HV cable layouts, enabling precise simulations and system integration studies.
Thermal & Capacity Analysis: Helps prevent overheating and boosts system resilience under varied load conditions.
Seamless Power System Integration: Easily integrates with power system software tools streamlining workflows across power studies.
Notable EPS Projects – 132kV Onshore Wind Farm
Client: Undisclosed Sector: Renewables Location: Scotland Date: December 2024
Project Summary:
For a wind farm located in Scotland, we conducted several HV and MV cable studies to ensure grid compliance and long-term reliability. Our electrical engineers used ELEK Cable HV to analyse the site’s cable rating, thermal performance, short-circuit behaviour and shied overvoltages. To ensure optimal electrical design and support seamless integration to the grid, we modelled the client’s cable configurations to verify their suitability under real-world conditions.
“We chose ELEK Cable HV to improve accuracy and drive innovation in our high-voltage electrical designs. After using the software for a couple of months, we’ve already seen significant benefits. Its user-friendly interface and instant results for complex calculations have streamlined our workflow, enhancing both efficiency and precision. Partnering with ELEK Software reflects EPS’s commitment to excellence, ensuring we continue to meet the highest standards for our clients.”
Adrian Hall, Managing Director – EPS
Looking Ahead
As we move forward, EPS remains dedicated to exploring further innovations and partnerships that allow us to provide unmatched value and impact across the energy sector. Are you ready to take your project to the next level?
Contact us today to explore how our advanced electrical engineering solutions–now backed by ELEK Cable HV software–can boost the performance, reliability, and sustainability of your electrical infrastructure.
Given the tight deadlines and budget restraints, the level of service Engineering Power Solutions provided was outstanding. The offshore UPS consolidation project was engineered and designed to the platform’s requirements and offshore standards minimising platform shutdowns.